Course page PDF
CS 486/686
Introduction to Artificial Intelligence

Lecture 1

Adapted from CS486/686 slides by Alice GaoAlice Gao, Blake VanBerloBlake VanBerlo, and Wenhu ChenWenhu Chen.

Upcoming: Distinguished Lecture

Prof. Kyunghyun Cho (NYU)

Tue May 26, 10:00–11:30 AM · DC 1302

kyunghyuncho.me

More on Prof. Cho later in this lecture.

Learning goals

  • Meet me and your classmates.
  • Get a map of the course.
  • Spot AI in the wild.

Who am I?

Now
Assistant Professor, Waterloo CS · Associate, Harvard CS · Faculty Affiliate, Vector Institute
Research
Natural language processing & machine learning
Before
Postdoc at AI2 · PhD at Harvard (Rush, Shieber) · MS at CMU (Xing) · BE at Tsinghua (Zhou)

Who are the TAs?

  • Liliana Hotsko (lhotsko@) — Piazza
  • Bihui Jin (b27jin@)
  • Larry Yinxi Li (y3395li@)
  • Yuxuan Li (y624li@)
  • Henry Lin (h293lin@)
  • Hala Sheta (hsheta@)
  • Dake Zhang (d346zhan@)

All emails end with @uwaterloo.ca.

Course roadmap

L1 Intro Search L2–L5 Uncertainty L6–L11 Decisions L12–L15 ML / Deep Learning L16–L21 L22 Recap

4 modules · 22 lectures

Heads up: this is classical AI. We do not cover LLMs, ChatGPT, or modern deep learning at scale. Full picture later in this lecture.

Module 1 — Search (L2–L5)

Rubik's cube
A classic search problem: 4.3 × 1019 states.
  • Generic search algorithm + complexity / completeness
  • Uninformed: DFS, BFS · Heuristic: A*
  • Constraint satisfaction problems + arc consistency
  • Local search: simulated annealing, genetic algorithms

Module 2 — Reasoning under Uncertainty (L6–L11)

Car-diagnosis Bayesian network
Car-diagnosis Bayesian network: infer hidden causes from observed evidence.
  • Probability rules + independence + Bayes' rule
  • Bayesian networks + D-separation
  • Variable elimination for inference
  • Hidden Markov Models + Forward–Backward

Module 3 — Decision Making (L12–L15)

MDP diagram with states, actions, rewards
States S, actions A, rewards R: a sequence of decisions under uncertainty.
  • Decision theory: actions, utility, expected utility
  • MDPs: making a sequence of decisions under uncertainty
  • Value iteration for optimal policies
  • Reinforcement learning: TD learning + Q-learning

Module 4 — Machine Learning and Deep Learning (L16–L21)

2-layer feedforward neural network
A 2-layer feedforward neural network.
  • Supervised vs. unsupervised · bias–variance trade-off
  • Unsupervised: k-means clustering
  • Decision trees
  • Neural networks + backpropagation

Course website

bit.ly/cs486

Bookmark it — everything lives here.

Getting help

  • Office hours — 6 TAs across the week (see next slide).
  • Piazza — public posts for course content, private posts for personal issues. We aim to reply within ~2 business days.
  • Email — only for confidential matters.

Office hours

Start the week of May 18. Zoom links one-click on the course website.

Day Time TA Where
Mon1:00–2:00 PMLarry Yinxi LiZoom
Mon2:00–3:00 PMDake ZhangZoom
Mon3:00–4:00 PMYuxuan LiZoom
Wed1:00–2:00 PMHala ShetaZoom
Thu10:00–11:00 AMHenry LinZoom
Fri3:00–4:00 PMBihui JinDC 2555

Liliana Hotsko runs Piazza (no OH).

Assignments

  • 3 assignments, ~20 days each.
  • Written + programming parts.
  • Submit everything on Learn.

Chat assignments with Chrysalis

  • 10 chats × 2% = 20% of your grade.
  • Teach Chrysalis what you learned each week by answering questions in a chat interface.
  • Graded on participation: full marks for any genuine attempt; no penalty for wrong answers. Marks lost only for skipped or low-effort answers.
  • Sign up at andromeda-208.cs.uwaterloo.ca with your WatIAM @uwaterloo.ca email. Full instructions on the course page.

Project

  • CS 686: required (30% of grade).
  • CS 486: optional (+10% bonus).
  • Individual or groups up to 3.
  • Topic open: RL, vision, NLP, biomedical, etc. — not a public-GitHub clone.
  • Proposal mid-term; final report after the exam.

Final exam

  • 2.5 hours, date/time TBA.
  • No makeup exam.
  • CS 486 students must pass the exam to pass the course.
  • Covers all course material.

Score breakdown

CS 486
Assignments 30%
Chat 20%
Final exam 50%

+ Optional project: 10% bonus.

CS 686
Assignments 30%
Project 30%
Final exam 40%

The goal of AI

  • Sense, comprehend, act, and learn.
  • Use computation to solve hard problems.
  • Not limited to biology-inspired methods.

Birth of AI

Alan Turing
Alan Turing, c. 1928
  • Alan Turing (1912–1954): WW2 codebreaker; asked "Can machines think?"; proposed the imitation game.
  • Dartmouth, 1956: John McCarthy coins the term artificial intelligence.
  • McCarthy also invents Lisp.

The Turing Test

Interrogator asks questions text terminal (no audio/video) Human claims to be human Machine also claims to be human

If the machine fools the interrogator, it "passes" the Turing Test.

ELIZA — pattern matching that "fooled" people (Weizenbaum, 1966)

ME: Hi
ELIZA: How do you do? What brings you to see me?
ME: I'm thinking of taking a course in artificial intelligence.
ELIZA: Why do you say that?
ME: I'm worried about it
ELIZA: Are you worried often?
ME: when I take AI courses
ELIZA: What happened when you take ai courses?
ME: I usually spend long nights doing assignments
ELIZA: Earlier you said you felt worried?
ME: about AI courses
ELIZA: Maybe your plans have something to do with this.
ME: no
ELIZA: Why not?
ME: because I think you are a computer
ELIZA: Is it because you think I am a computer that you came to me?

Loebner Prize — the Turing-Test competition, 1990–2019

  • Annual Turing-style contest, launched by Hugh Loebner.
  • Grand prizes ($25K text-only / $100K text + audio + video) never awarded.
  • Replaced today by modern LLM evaluations.
CONFEDERATE: Hello, my name is Sam and I am the human
JUDGE: Hi Sam, tell me which is larger, a TV screen or Belgium.
CONFEDERATE: Belgium is a little bit larger.
JUDGE: Wljso lwjejdo wleje elwjeo wjeol, isn't it?
CONFEDERATE: Is that Polish?
JUDGE: Which is further away from this apartment, Queens or the Queen of England?
CONFEDERATE: If the Queen is visiting Manhattan, she is closer.

SHRDLU — Winograd, 1968

  • First system that linked language to a (virtual) physical world.
  • Tiny domain: a "blocks world".
Pick up a big red block
OK
Grasp the pyramid
I DON'T UNDERSTAND WHICH PYRAMID YOU MEAN
What does the box contain?
THE BLUE PYRAMID AND THE BLUE BLOCK.
What is the pyramid supported by?
THE BOX.
How many blocks are not in the box?
FOUR OF THEM

Games as an AI testbed

Zero-sum game tree
  • Min–max: one player maximizes, the other minimizes.
  • Game playing = search over states.

Chess — Deep Blue, 1997

Chess board
  • ~\(10^{100}\) game-tree states.
  • 1997: IBM Deep Blue defeats Garry Kasparov, 3.5–2.5.
  • Method: deep lookahead + handcrafted evaluation.

Go — AlphaGo, 2016

Go board
  • ~\(10^{360}\) states — far beyond brute-force search.
  • 2016: AlphaGo (DeepMind) defeats Lee Sedol 4–1.
  • Recipe: Monte-Carlo tree search + value net + policy net + self-play.

Poker

Poker
  • Hidden information + opponent modeling + long-term reward.
  • 2015: heads-up limit hold'em solved.
  • 2019: superhuman 6-player no-limit poker.
Bowling et al., 2015 (Science 347) · Brown & Sandholm, 2019 (Science 365).

Atari games

Atari games
  • End-to-end RL on raw pixels — CNN + Q-learning.
  • Beat humans on 3 / 7 Atari 2600 games tested.
  • The starting point for modern deep RL.

StarCraft II — AlphaStar, 2019

StarCraft II
  • Multi-agent, imperfect information, huge action space.
  • Grandmaster level via multi-agent RL + league self-play.
Vinyals et al., 2019 (Nature 575) · demo video.

AlphaFold — protein structure

AlphaFold
  • Predicts 3D protein structure from sequence.
  • EvoFormer architecture + Protein Data Bank training.
  • Reduced months-to-years of lab work to minutes.

The deep learning era

AI performance vs human over time
  • Pre-2012: SVMs, decision trees, boosting.
  • 2012: AlexNet on ImageNet → deep learning takes off.
  • AI has surpassed humans on classic benchmarks; harder ones (GPQA, SWE-bench, ARC-AGI) still rising fast.

ImageNet — the spark

ImageNet challenge
LSVRC winners over time

1000-class image classification. The curve was flat — then AlexNet (2012) arrived. Today: essentially solved.

Image generation

Timeline of AI-generated faces

A decade of AI-generated faces.

Supervised vs. self-supervised

Supervised learning

Supervised: humans label data.

Self-supervised pretraining

Self-supervised: model predicts parts of unlabeled data.

Large language models — 2026 frontier

  • From GPT-3 (2020) and ChatGPT (2022) to today's GPT-5.5, Claude Opus 4.7, Gemini 3.1 Pro.
  • Strong open-weight competitors: Llama 4, DeepSeek V4, Qwen 3.6, GLM-5.1.
  • Mixture-of-Experts is standard; closed labs no longer publish parameter counts.

What today's LLMs can do

Reasoning

"Thinking" models trade inference compute for hard math, science, coding (o-series, DeepSeek-R1).

Long context

1M+ token windows — whole codebases or books in a single prompt.

Multimodal

Text, images, audio, video in one model.

Agentic tool use

Calls tools, browses, executes code over long horizons (MCP, Claude Code, agent modes).

What this course IS (and is NOT)

IS — Classical AI (~1970s–2000s)

  • Search (DFS, BFS, A*, CSPs, local search)
  • Probabilistic reasoning (Bayes nets, HMMs, variable elimination)
  • Decision-making under uncertainty (MDPs, value iteration, basic RL)
  • Foundations of ML (decision trees, basic neural nets, backprop)

IS NOT — Modern AI

  • Training / building LLMs (GPT, Claude, Gemini)
  • Prompt engineering or agentic LLM applications
  • Modern deep learning at scale (transformers, diffusion, foundation models)
  • Production ML systems, GPU clusters, RAG, fine-tuning
Reality check: most empirical AI breakthroughs of the last 5 years came from scale + deep learning, not from the algorithms in this course. For modern AI, take CS 480 / 680, grad NLP/ML courses, or read recent ICLR/NeurIPS papers.

Keeping up with modern AI

Most of what's happening in AI isn't in textbook. Twitter/podcasts are where the field actually communicates.

Twitter / X

Frontier labs
@AnthropicAI · @OpenAI · @GoogleDeepMind · @thinkymachines

Researchers
@karpathy (Andrej Karpathy) · @srush_nlp (Sasha Rush) · @ylecun (Yann LeCun) · @dwarkesh_sp (Dwarkesh Patel)

Podcasts and long-form

Or just ask the models themselves: ChatGPT · Claude · Gemini — very good at explaining recent papers, code, and jargon.

Personal opinion. Not an endorsement by Waterloo.

This is how “search” is done in 2026

Karpathy's autoresearch, March 2026 — not the informed / uninformed search in our L2–L5 module.

Human edits program.md AI agent edits train.py 5-min training measure val_bpb keep if val loss improved · repeat indefinitely

Karpathy stripped nanochat down to a single-GPU, ~630-line training repo. The agent edits train.py; the human only edits the prompt that drives the agent. Each training run is a fixed 5 minutes.

~12 experiments per hour. ~100 while you sleep. Winners are committed to a feature branch.

Andrej Karpathy. autoresearch, March 2026. Announcement: x.com/karpathy/status/2030371219518931079.

What an overnight autoresearch run looks like

Karpathy's published progress.png — 83 experiments, 15 kept (green). Lower validation BPB is better.

Autoresearch progress chart: 83 experiments with 15 kept improvements

Gray dots: tried and discarded. Green dots: kept. The agent autonomously tuned batch size, warmup, warmdown, depth, window pattern, RoPE base frequency — and yes, even the random seed.

Andrej Karpathy, autoresearch, March 2026. Chart from the repo's progress.png.

My take: this is what replaces classical AI

Personal opinion. Not consensus.

387→ 507→ 839→ 864 (max)

Codex (OpenAI, May 2026) writes & iterates a pure-Python Breakout policy. No neural network trained.

Same recipe: MuJoCo Ant 6000+, HalfCheetah ~11,800 (Deep-RL range); Atari57 median ≈ PPO across 342 unattended runs.

My read: LLM-driven code synthesis is what replaces the hand-derived classical algorithms in this course.
Jiayi Weng (OpenAI). "Learning Beyond Gradients", May 2026. Single blog post, not peer-reviewed. The framing is my personal opinion.

Distinguished Lecture: Prof. Kyunghyun Cho (NYU)

Prof. Kyunghyun Cho
Photo: NYU Photo Bureau / Gallo

Professor of CS & Data Science at NYU; Co-Director of the Global Frontier AI Lab (with Yann LeCun).

Co-author of two foundational papers in modern NLP:

  • The GRU recurrent unit (Cho et al., 2014).
  • The seminal attention mechanism for translation (Bahdanau, Cho, Bengio, 2015) — direct ancestor of today's LLMs.

His work directly inspired my PhD.

Tue May 26, 10:00–11:30 AM · DC 1302 · kyunghyuncho.me

Learning goals (recap)

  • Meet me and your classmates. ✓
  • Get a map of the course. ✓
  • Spot AI in the wild. ✓

Don't miss the Distinguished Lecture!

Prof. Kyunghyun Cho (NYU)

Co-inventor of attention (Bahdanau, Cho, Bengio, 2015) and the GRU

Tuesday, May 26, 2026

10:00–11:30 AM · DC 1302

kyunghyuncho.me